Gallery

A selection of Intralogix projects: stacker crane retrofits, new control systems, roller conveyor and shuttle systems — from construction in our own workshop through to commissioning on the customer’s site.

Most of what you see here is existing equipment. The steel structure of a stacker crane lasts for decades; what we replace is everything that determines performance: the control system, the drives, the safety technology and the wear parts. A crane that looks new in these photographs has in many cases been standing there for twenty years.

What you will see:

  • In our workshop in Dinxperlo — crane beams, masts and structural parts during a full rebuild. If an installation can be spared, we collect it and rebuild it at our premises; that is faster and more controlled than working around production.
  • Assembly inside the racking — erecting the crane mast and top beam in a high-bay warehouse, usually within a fixed window in which the aisle is out of service.
  • Control cabinets and control systems — Siemens Simatic S7-1500F, SEW drive controllers and the cabling that goes with them.
  • Roller conveyor and transport systems — infeed and outfeed around the cranes, including the control system that keeps everything in step.
  • Maintenance on site — our engineers at work in a running warehouse.

Do you recognise an installation like your own? The brands page sets out what we do per manufacturer.

Do you recognise your own installation in these projects?

From roller conveyors to cranes and control systems: we work on existing installations, independently of the original manufacturer. Tell us what you want to improve.