Service and maintenance for your logistics system

Intralogix carries out preventive maintenance and breakdown response for stacker cranes, shuttle systems and roller conveyor systems. Independent of the original manufacturer, on installations from Lalesse, Dematic, Swisslog, Dambach, LTW, MIAS and TGW.

Two Intralogix engineers servicing the control cabinet of a stacker crane

A stacker crane is not a machine you only touch once it has stopped. Parts wear out predictably — hoisting ropes, drives, sensors, energy chains. Replace them in time and you choose the moment yourself. Wait until something breaks and the moment is chosen for you, usually on the busiest day of the year.

Preventive work and breakdown response

We do both.

Scheduled maintenance on a schedule that fits how hard your installation runs. We come at agreed times, check what there is to check, replace what needs replacing and record what we found.

Breakdown response when something goes wrong unexpectedly. Our engineers know these installations; they are not working out how the machine functions, only where it is going wrong.

Engineer aligning the running rail of a stacker crane

We work to our own checklist

Maintenance here is not a walk-around. Every crane is worked through using our own checklist, from which we cover the points that apply to your type of crane. Those checks run across the whole machine: general safety, travel gear, drives and gearboxes, mast and bottom beam, hoist, top beam and aisle-changing mechanism, current collectors and cabling, carriage and load handling device, the fall arrest and overload protection, the control cabinets and the operator controls. Once a year we include the rail track as well.

A few examples of what is on that list:

  • broken strands, cracking and lubrication of the hoisting rope;
  • the speed limiter, the safety rope and the safety brake;
  • the brake air gap of the hoist and travel motors — measured and recorded;
  • wear on the travel wheels — measured and recorded;
  • the V-groove and axial play of the rope sheaves;
  • the condition of the energy chain running to the carriage;
  • the alignment of the current collectors;
  • filters, fans and the PLC batteries in the control cabinet.

We measure; we do not just tick boxes. Where wear is involved we record the actual dimension. Across several visits that shows us the trend, so we can tell you that a part will need replacing at the next service — instead of it turning out to be worn today. That way you plan a replacement rather than wait for one.

On every visit we also record what is there: the serial numbers of the hoisting rope and the speed limiter, the hour meter reading of the crane and anything that struck us. Over time you build up a file on your installation.

Maintenance on the drive of a stacker crane

Two ways to buy maintenance

Under a maintenance contract. We come as agreed, at a contract price fixed in advance. The visits are in our planning and you know what it costs.

And the most important part: contract customers take priority when a machine goes down. On the day something fails, that is the difference that counts.

On call. You ring when something is wrong and we schedule it together, as far as is possible. You pay the applicable rates. More expensive per visit, and without priority — but you are not tied to anything.

Which suits you depends on how critical your installation is. If your whole process stops when the crane stops, you already know the answer.

Looking in without driving out first

Where the installation is set up for it, our engineers can look in remotely. That saves time in making the diagnosis, and often a fault is cleared before anyone is on the road.

On installations we have modernised, that facility is there as standard.

Siemens operator panel of a warehouse system

Where we work

For maintenance we work mainly in the Benelux and Germany. Where needed we travel worldwide — we have modernised installations as far away as Singapore.

Independent of the manufacturer, with knowledge from the inside

We are not tied to one manufacturer. Our engineers come from crane building and know these installations from the structure through to the control system.

That also means we will tell you honestly when maintenance is no longer the answer. If reliability is falling because components are no longer available, carrying on repairing is money into a bottomless pit. That is when retrofit is the conversation to have.

Wondering what we do on your make? The brands page sets out per manufacturer what we have carried out and where our engineers’ knowledge comes from.

Maintenance team at work in a high-bay warehouse

Frequently asked questions about maintenance

How often does a stacker crane need maintenance?

That depends on how hard the installation runs. We set the schedule to that rather than to a fixed number of visits per year.

If your warehouse runs in shifts, hoisting ropes, travel wheels and energy chains wear faster than on an installation that stands still for part of the day. We include the rail track once a year.

What exactly do you check?

We work through every crane using our own checklist, covering the points that apply to your type of crane. The checks run across the whole machine: general safety, travel gear, drives, mast and bottom beam, hoist, top beam and aisle-changing mechanism, current collectors, carriage and load handling device, the fall arrest and overload protection, the control cabinets and the operator controls.

We measure; we do not just tick boxes. Where wear is involved we record the actual dimension — the brake air gap, the travel wheels, the rope sheaves. Across several visits you see the trend, and we can tell you that a part will need replacing at the next service.

What is the difference between a maintenance contract and maintenance on call?

Under a contract we come as agreed, at a price fixed in advance, and the visits are in our planning. Contract customers also take priority when a machine goes down.

On call, you ring when something is wrong and we schedule it together, as far as is possible. More expensive per visit and without priority, but you are not tied to anything.

Which suits you depends on how critical your installation is. If your whole process stops when the crane stops, you already know the answer.

Do you maintain installations you did not build?

Yes, that is by far the largest part of our work.

We work independently of the original manufacturer on installations from Lalesse, Dematic, Swisslog, Dambach, LTW, MIAS and TGW among others. Our engineers come from crane building and know these machines from the structure through to the control system.

The brands page sets out per manufacturer what we have carried out.

Can you look in remotely when something goes wrong?

Where the installation is set up for it, yes. That saves time in making the diagnosis, and often a fault is cleared before anyone is on the road.

On installations we have modernised, that facility is there as standard.

What happens when maintenance no longer pays off?

Then we say so. If reliability is falling because components are no longer available, carrying on repairing is money into a bottomless pit.

That is the point at which retrofit is the conversation to have: the steel structure stays and everything that determines performance is replaced.

Maintenance on your installation?

Tell us what you have and how hard it runs. We will look at what is needed and what that costs — with or without a contract.